Macro-Sea

Brooklyn-based creative studio and development practice founded by David Belt. Best known publicly for the 2010 Brooklyn rooftop dumpster pools installation that became a defining image of the early-2010s wave of low-cost / high-impact urban placemaking.

A prototype Macro-Sea dumpster pool sits on the south face of 601 Delaware in San Antonio — acquired by the project as a sculptural / future-installation piece. Its presence on the H&H property aligns the adaptive-reuse program at 601 Delaware with the broader creative-placemaking lineage Macro-Sea helped establish.

Why Macro-Sea matters for 601 Delaware

The 601 Delaware project is an adaptive-reuse of a 1932 industrial building into a mixed-use heritage venue — museum + roastery + education + events. That project type sits squarely in the lineage Macro-Sea operates in: take an existing industrial fabric, layer in a programmatic mix that activates the space without erasing it, treat the building shell as cultural content rather than as backdrop.

Specific resonances:

The 601 Delaware dumpster pool prototype

FieldValue
LocationSouth face of 601 Delaware, on the grass-overgrown apron in front of the building
AcquisitionAugust 2015 — one of three MOCA Tucson shipping-container pools; curator was first in line after Jim Poteet forwarded the museum sale email (mobile-pool-history)
Pool footprint~7′ × 20′ 3″ perimeter
Deck footprint~17′ 6″ × 30′ 11″; deck panels ~5′ 4″ × 5′ 3″
Power30 A / 125 V L5-30 twist-lock (Hubbell HBL2615SW on pool + HBL2610SW on building)
PumpPentair WhisperFlo 11771 WF-23 — ¾ hp, 10.8 A, 90 gpm max
Capacity / fill~5,300 gal (~700 cu ft); ~12 hr fill at factory flow (wiki estimate)
Weight (empty)~10,000 lbs (wiki estimate — verify before crane lift)
Equipment on siteSta-Rite PLM150 filter; RolaChem chlorine/acid pumps + tanks; Aqua Ultraviolet 25 W sterilizer; Pentair skimmer/light/niche parts per mobile-pool
Current stateOn-site; disposition open — static prototype, activated courtyard pool, or rooftop crown per vision
Full systems compile601 Delaware — Building Systems § pool

Acquisition narrative (curator wiki + public sources)

Broader lineage in mobile-pool-history and 2015 MOCA exhibition record:

WhenEvent
2009Brooklyn dumpster-pool images filed after Rackspace; Jim Poteet container-architecture thread
Pre-2015601 Delaware acquired near Alamodome; in-ground SA pool economics rejected (~$50k dig on limestone)
26 Aug 2015Poteet forwards MOCA email — three $80k pools, one left; down payment secured; first in line
Jun–Sep 2015MOCA Mobile Pools in Great Hall — Jocko Weyland curator; Macro-Sea donation
Late 2015Tucson inspection + farewell fundraiser; pool purchased
FreightFlatbed to San Antonio; wiki names West Texas Dumpsters (BOL unverified)
DeliveryWrong forklift / beached at placement (curator detail TBD)

Still to file in raw-archives/records/: down-payment receipt, MOCA sale invoice, freight BOL, delivery photos, Danny’s Place context (wiki stub — curator to confirm).

The pool’s presence on the property is a curatorial asset — it gives the south-face courtyard a thematic anchor that ties the H&H heritage program to the broader creative-placemaking conversation Macro-Sea helped start.

Open questions

See also